structure

structure . You are required to calculate permanent actions for the office building from figure 1 for: - beams AD, BE and EH, - columns A, B, D and E at section 1 and section 2 Fig. 1 Beams and columns are made by concrete with a density of 2400 kg/m3. Assume for this exercise that: - cross section for beams is 250 ? 500 mm, - cross section for columns is 500 ? 500 mm, - concrete floor height is 150 mm.