Production Management

o CASE STUDY 1. Production Planning and Control. (350-400 words)

 Define: Design Capacity, Effective Capacity and Actual Capacity.
 Calculate the Design Capacity, the Effective Capacity, and the Actual Capacity of the
packaging machine, during 2020
 Define the Percentage of Efficiency and the Percentage of Utilization
 Calculate the % of Efficiency and the % of Utilization of the packaging machine during
2020
 How could the company improve the % of Efficiency and the % of Utilization?
o CASE STUDY 2. Quality Control. (350-400 words)

 Define the 3 types of Quality Costs. If you where the Production Manager of a company,
in which of the 3 would you invest the most? Discuss your answer.
 Calculate the Efficiency and Effectiveness of each of the 4 processes. If as a you had to
look for ways to increase the Efficiency and Effectiveness of those processes, how
would you do it?
o CASE STUDY 3. Maintenance & Waste Management. (350-400 words)

 Describe 3 of the 8 pillars of the Total Productive Maintenance (TPM).
 Of the 8 wastes established by the Lean Manufacturing methodology, which do you
consider to be the 3 most important for a company that produces electronic components
and equipment? Why?