Hydraulic, Math, Petrolum, Statics

Question
1 of 25
7,700 feet of drill pipe is to be tripped out of a wellbore full of drilling mud. The hydrostatic pressure at 7,700 feet with the drill pipe in the hole is 4,350 psi. The driller pulls the drill pipe out of the hole, but does not keep the hole full of fluid while pulling the drill pipe out. The fluid level in the well drops by 1,775 feet due to the volume of the drill pipe being removed. The hydrostatic pressure at 7,700 feet is now 3,250 psi. What is the change in hydrostatic pressure, in psi?
Question
2 of 25
A hole, 11 7/8 inch in diameter, has been drilled to a depth of 4,489 feet . Casing that has a 9 inch outside diameter is run to the bottom of the hole. If each joint of casing is 42 feet long, how many joints did it take to reach the bottom of the drilled hole?
3 of 25
After running a coiled tubing unit for 20 minutes, Judson has 1,724 feet of coiled tubing in the well. After running the unit another 30 minutes, he has 4,310 feet of tubing in the well. His call sheet shows he needs a total of 15,390 feet of tubing in the well. How many more feet of coiled tubing does he need to run into the well?
4 of 25
Brendan is running coiled tubing in the wellbore at a rate of 99.4 feet a minute. At the end of 8 minutes he has 795.2 feet of coiled tubing inside the wellbore. After 2 more minutes he has run an additional 198.8 feet into the wellbore. How many feet of coiled tubing did Brendan run in the wellbore altogether?
5 of 25
Coiled tubing is being run into a 17,000 foot wellbore at 65.5 feet per minute. It will take a little more than 4 hours to reach the bottom of the well. After the first three and a half hours, how deep, in feet, is the coiled tubing?
Question
6 of 25
Camden spent a total of $599.38 for 63 meals. How much did he average on each meal?
Question
7 of 25
Jude is running coiled tubing into the wellbore at a rate of 96.5 feet per minute. At the end of 11 minutes, how many feet of coiled tubing does he have inside the wellbore?
Question
8 of 25
Our job calls for blending 2 pounds of sand with each gallon of water we pump. How many gallons of water will we pump for 3000 pounds of sand?
9 of 25
Two mountain mover trucks for providing fracturing sand are on location. One truck has 258 cubic feet of sand in one compartment and 321 cubic feet of frac sand in another compartment. Three additional compartments on this truck are empty. The other truck has frac sand in all five compartments, which when combined total to 2198 cubic feet of frac sand. What is the total volume, in cubic feet, of fracturing sand in these two trucks?
Question
10 of 25
We will be pumping displacement fluid at a rate of 4.85 BPM. The mud pumps on location are metered in GPM. At what rate in GPM will the mud engineer need to run his pumps in order to achieve a 4.85 BPM pump rate?
Question
11 of 25
Yesterday, Cody’s last two meals cost $8.23, and $6.43. If he eats 6 meals per day, and each meal averages $7.33, how much will he spend on food in the next 12 days?
Question
12 of 25
You are running coiled tubing into the wellbore at 95 feet per minute for 18 minutes when you stop for a weight check. Then you run more coiled tubing in the hole at the rate of 100.4 feet per minute for 26 minutes. How many feet of coiled tubing were in the well when you stopped for the weight check?
Question
12 of 25
You are running coiled tubing into the wellbore at 95 feet per minute for 18 minutes when you stop for a weight check. Then you run more coiled tubing in the hole at the rate of 100.4 feet per minute for 26 minutes. How many feet of coiled tubing were in the well when you stopped for the weight check?
Question
14 of 25
3,780 feet of 5 3/4 inch casing is run into a 9 5/8 inch hole. 337 barrels of cement slurry is pumped into the casing and up into the annular space. To displace the cement slurry out of the casing, 89.4 barrels of a displacement fluid is pumped after the cement slurry. You leave 84 feet of cement in the casing and the space between the casing and the drilled hole is completely filled with cement slurry. How many feet of casing will be full of the displacement fluid?
Question
15 of 25
A 8795 feet wellbore has been perforated from a depth of 8467 to a depth of 8544 feet. The customer then ran tubing to 89 feet above the top perforation. At what depth in feet will the bottom of the tubing be?
Question
16 of 25
A hole, 6 5/8 inches in diameter, is drilled 9,501 feet into the earth. Casing that has a 4.75 inch outside diameter is run to the bottom of the hole and is perfectly centered. What is the distance in inches between the outside of the casing and the inside of the drilled hole?
Question
17 of 25
One stage of a frac job calls for 2,500 gallons (clean volume) of a liquid to be pumped. Proppant will also be added in the concentration of two pounds of proppant per gallon of liquid. The proppant will add 0.0467 gallons of volume per pound. How many pounds of proppant will you use?
18 of 25
Our job design calls for 812 sacks of cement that has a water requirement of 7.8 gallons/sack. What is our total mix water requirement in barrels?
Question
19 of 25
A cased and cemented hole with a measured depth of 8,291 feet is perforated from 8,202 feet to 8,246 feet. The customer wants tubing to be at least 40 feet above the top of the perforations but wants the tubing to be at the rig floor located 20 feet above ground level. John is using 31 foot joints of tubing. How many joints should he use to satisfy the customer’s request?
Question
20 of 25
A hole, 7 5/8 inches in diameter, is drilled 4,555 feet into the earth. Casing that has a 6 5/8 inch outside diameter is run to the bottom of the hole. You are going to use 30 barrels of a displacement fluid during this job. If each joint of casing is 40 feet long, how far out of the drilled hole (in feet) will the casing be when resting on the bottom of the hole?
Question
21 of 25
Casing, which is 7,897 feet deep, has been perforated from a depth of 7,543 feet to 7,645 feet. Valerie runs coiled tubing at a rate of 31.1 feet per minute for 4 hours. How far in feet is the bottom of the coiled tubing from the top of the perforations?
Question
22 of 25
Bill has two types of employees: Type 1 and Type 2. Type 1 employees make $13.23 per hour while Type 2 employees make $8.74 per hour. This week the Type 1 employees worked 40 hours each and Type 2 employees worked 28 hours each. There are three Type 1 employees and four Type 2 employees. How much is Bill’s payroll this week?
Question
23 of 25
Piper’s cased and cemented hole has a measured depth of 12,659 feet. It is perforated from 12,582 feet to 12,621 feet. The customer wants tubing to be at least 50 feet above the top of the perforations but wants the tubing to be at the rig floor located 16 feet above ground level. Piper is using 31 foot joints of tubing. How far above the top of the perforations will the tubing be in feet?
Question
24 of 25
One stage of a frac job calls for 2000 gallons (clean volume) of a liquid and two pounds of proppant per gallon of liquid. The proppant adds 0.0454 gallons of volume per pound. What is the total volume of the mixture (dirty volume) in gallons for this stage?
Question
25 of 25
Casing, with an inside diameter of 10.711 inches, has been run to the bottom of a 11,598 foot open hole and filled completely with cement. The cement is followed by a displacement fluid until there is only 42 feet of cement left in the casing. What is the volume in cubic feet of cement in the casing BEFORE the flush fluid is pumped?

find the cost of your paper

This question has been answered.

Get Answer