ESTIMATION, MEASUREMENT AND SCHEDULING (EC211C).

ESTIMATION, MEASUREMENT AND SCHEDULING (EC211C).

ASSIGNMENT 2.
Take off quantities, in accordance with SMM7 (7th Ed), for all of the work required,
(excavation, groundwork and filling, concrete, and brickwork), for the foundation shown
on Drawing No 2, (attached).
Please make sensible assumptions for any information not provided. Any assumptions
made should be reported in a query sheet.
Marks will be awarded for:
1.
2.
3.
4.
5.
6.
7.
Take-off list and introductory information;
Accuracy of dimensions;
Correct descriptions;
Compliance with SMM7 rules;
Clarity and comprehensibility of method;
Setting out and presentation of dimensions;
Queries raised and assumptions made (if any)
A
A
PLAN SCALE 1:50
SECTION A-A SCALE 1:20
Title
Drawing No.
FOUNDATIONS
2. DRAWING B
Scale
Date
Drawn
1/50 & 1/20
21 November 2014
EC211C

PLACE THIS ORDER OR A SIMILAR ORDER WITH US TODAY AND GET AN AMAZING DISCOUNT 🙂

find the cost of your paper

This question has been answered.

Get Answer