Developing a programme

Developing a programme for the following scenario:
• Prepare a programme, in the form of a Gantt Chart, with no more than
30 activities to cover the replacement of a domestic parking bay.
• The parking bay is adjacent to a block of flats and provides parking
for 4 cars.
• The current surfacing is cracking and settling . It is surfaced with
blacktop but will be replaced with concrete block pavers for greater
robustness and longevity.
• In preparing a programme you are to identify the tasks, their
durations, the linkages between tasks, show any float (or time risk
allowance) and a critical path.
• The tasks need to cover 4 main areas:
• Design
• Excavation and removal of material
• Preparation of the area
• Construction and finish of the area
(the file provides an example while stating the assignment at the same time)

find the cost of your paper

This question has been answered.

Get Answer