You are a member of the design team assigned by a ‘property services’ practice

You are a member of the design team assigned by a ‘property services’ practice

Technology 2, Year 2 / Level 5
COURSEWORK 2 ASSESSMENT BRIEF
PROGRAMMES
BSc (Hons) Architectural Design & Technology
BSc (Hons) Building Surveying
BSc (Hons) Construction Project Management
BSc (Hons) Quantity Surveying
BSc (Hons) Construction Management
Submission Deadline: by 16:00 hrs (GMT) on Friday the 19 Dec 2014
This assessment contributes 50% of the marks for the above module.
This coursework must be carried out individually.
Scenario (hypothetical)
The four-storey building indicated on the attached drawings is a proposed new building for the
External Relations Division of The University of Salford, to be built on the former site of the
Northern Car Park (currently under development).
The attached schematic layouts have been prepared by architects acting for the University. The
floor plans show how accommodation is to be broadly distributed, though in addition the
following should be noted:
Ground floor plan
0 One wing is an Office
0 The central area is a void over the swimming pool
0 The other wing provides internal car parking spaces as per the layout shown on the plans.
Basement
0 Designated as plant and storage areas, swimming pool and Car Park.
First and second
0 Designated as office use
0 The client requires flexibility of layout on these floors, i.e. to be able to partition off
individual offices if the need arises, or to be able to have an open plan layout.
0 Layouts may change over a period of time.
Top floor
Technology 2 – Coursework 2 – 2014/15 University of Salford l

PLACE THIS ORDER OR A SIMILAR ORDER WITH US TODAY AND GET AN AMAZING DISCOUNT 🙂

find the cost of your paper

This question has been answered.

Get Answer